Production management and real-time shop floor tracking


A work order is created from a sales order, a planning suggestion or a stock requirement, and stays linked to its source.
Each item has its bill of materials and its manufacturing routing, broken down into steps. Configurable bills of materials adapt to variants.
Material lots are reserved or picked for the work order. Traceability of the finished product builds up as production progresses.
Operators report progress and quantities produced, in one or several entries. The finished product goes into stock when it is reported.
Steps are shown one at a time on a phone or tablet. When a component is scanned, Bonx blocks the wrong one before it is used.
The cost of each work order is calculated from the materials actually consumed, labor and machine time, and is locked when the product goes into stock.
Was passiert, wenn ein Kundenauftrag eingeht? Vielleicht reserviert er Bestand oder wartet auf eine Margenprüfung. Hinter jedem Modul stehen Workflows und Prozesse, die zu 100 % von Ihnen definiert und gesteuert werden. Kein Projekt, kein Berater.

Ändern Sie einen Bestand, sieht die Planung es sofort. Aktualisieren Sie den Produktionsfortschritt, passt sich der Bestand sofort an. Alles arbeitet ohne Integrationsaufwand zusammen – auf denselben Echtzeitdaten.

Kontaktieren Sie uns
Production management software covers production: work orders, bills of materials, routings and shop floor tracking. An ERP also covers sales, purchasing, inventory, logistics and invoicing. Bonx combines both, so production works on the same data as the rest of the company.
Bonx covers a large part of shop floor execution: workstation instructions, real-time reporting, quality checks on steps and machine communication through the API. Production tracking happens in the ERP, with no separate system to synchronize.
Start with work orders and reporting on tablets or phones, on one line or one shop. Operators report at the workstation, inventory and progress update, and then you add quality checks and workstation instructions.
Yes. The cost of a work order includes the materials actually consumed, labor and machine time. It is locked when the finished product goes into stock.
